DAYS
Returns the number of days between two dates
Syntax
DAYS(end_date, start_date)
Parameters
- end_date: Required. The end or later date
- start_date: Required. The start or earlier date
Example
=DAYS("3/15/2024", "1/1/2024")Returns the number of days between two dates
DAYS(end_date, start_date)
=DAYS("3/15/2024", "1/1/2024")