Skip to Content

PDURATION

Returns the number of periods required by an investment to reach a specified value

Syntax

PDURATION(rate, pv, fv)

Parameters

  • rate: Required. The interest rate per period
  • pv: Required. The present value of the investment
  • fv: Required. The desired future value of the investment

Example

=PDURATION(0.025/12, 1000, 1200)
Returns: NumberSince: Excel 2013